DVC has not mentioned yet how the refurb will be done. In the past, Jambo went first and then Kidani. Moreover, there is no mention as to whether they will do a refurb where only part of one floor is done at a time as in the past, or, instead, adopt the new "Boardwalk" disaster of a refurb, where they attempt to do all floors for half of the building at one time -- that's the Boardwalk refurb that was supposed to be finished by March 1, 2024, but is still going on and still resulting with a number of members finding out they are being moved to Yacht Club, and for a substantial period of time for reservations in the fall 2023 and beginning of 2024, any rooms not scheduled for refurbed were being booked full right at 11-months out.
What has happened is that it appears that the outside refurbed at Kidani has already been done. That started with the redo of the pool two years ago, continuing thereafter to numerous parts of the building, and finally the redoing of the entire roof.